Hemmera Envirochem Inc. Environmental Consultant / Calgary Office
>>AEP Bioengineering Demonstration and Education Project
- Soil Bioengineering Subject Matter Expert. Location: Bow River through Inglewood in Calgary, AB. Client: Alberta Environment and Parks Year: 2016
|
|
Klohn Crippen Berger / Calgary Office
>>Assist with conceptual, preliminary, final design and specifications development
- Memorial Off-Ramp Moderate Erosion Site Re-habilitation Project. Location: Bow River Calgary Alberta. Client: City of Calgary Year: 2015 - present.
- Riverdale Avenue SW Retaining Wall Replacement Project. Location: Elbow River Calgary Alberta. Client: City of Calgary Year: 2015 - present.
- Harvie Passage Disaster Recovery Project. Location: Calgary Alberta Client: Alberta Transportation Year: 2015 - present.
|
|
Kerr Wood Leidal / Calgary Office
>>Assist with conceptual, preliminary, final design and specifications development
- King Creek Vegetation and Staking. Location: Kananaskis Region, AB Client: Environment and Sustainable Resource Development Parks Division, Kananaskis Region Operations Support, Infrastructure (Alberta Parks, now AEP) Year: 2015
|
|
City of St. Albert
- Sedimentation and Erosion Control - Grandin Ravine Upgrades. Location: City of St Albert, Alberta. Client: City of St Albert Capital Project Branch Year: 2013 - 2015
- Assist Stantec Consultant with conceptual, preliminary, final design and specifications development and the installation of 30 vegetated log check dams. The installation was implemented within the eroded Grandin Ravine over 800 linear m. The project included a 2 years repair and maintenance program.
|
|
Amec Earth Environmental / Calgary Office
- Streambank Slope Stability, Flood Control and Riparian Assessment and Evaluation for the City of Calgary. Location: Calgary, Alberta. Client: City of Calgary Water Resources Year: 2010 - 2012
- The designed guidelines were developed between 2010 and 2012. They were developed in conjunction with prime consultant and biologist group Cows and Fish. Terra Erosion Control contributed to the development of the assessment procedures and was instrumental in developing Appendix C of the guidelines, which selected suitable soil, ground, and water bioengineering applications based on site specific conditions and objectives.
|
|
City
of Edmonton
Asset
Management and Public Works Drainage Services
>>Edmonton,
Alberta. 2007 - 2015.
Prescription
development and implementation of vegetated
riprap and complex riprap application on storm water outfall
infrastructures.
- Outfalls
#03, 33, 56, 65, 78, 101,
13 and Belgravia, discharging in the North Saskatchewan
River
|
|
|
|
Teck
Cominco Metals Ltd.
>>Trail, British
Columbia. 2004 - 2014.
Prescription
development and implementation of erosion control and vegetation
establishment measures.
|
|
|
|
Nelson
Rod and Gun Club
>>Nelson,
British Columbia. 2006, 2008.
Prescription
development and implementation, on-site training of
volunteers for manual brushing treatment,
watering and fertilization of planted seedlings.
Co-ordination
of vegetated riprap
installation in collaboration with the city
of Nelson .
|
|
|
|
Syncrude
Canada Ltd.
>>Fort McMurray,
Alberta. 2003 - 2013.
Prescription
development and implementation of erosion control and vegetation
establishment measures.
|
|
|
|
Skansa
Chant
>>Castlegar,
British Columbia. 2005.
- Sites
assessment and prescription development for site re-habilitation
of industrial construction site.
|
|
|
|
Columbia
Power Corporation
>>Castlegar,
British Columbia. 2005.
Prescription
development and implementation of erosion control and vegetation
establishment measures.
- Shoreline
of the Brilliant Headpond Reservoir Project
- Training
of Selkirk College Students on Slocan River Riparian
Demonstration Project
|
|
|
|
Braderwoods Strata
Council
>>
Nelson, B.C. 2003, 2005.
Prescription
development and implementation of erosion control and vegetation
establishment measures. |
|
|
|
FortisBC
Inc.
>>Castlegar,
British Columbia. 2004
Prescription
development and implementation of sediment-source and riparian
treatments and vegetation establishment measures.
- Rover/Connor/Bird
Creeks
- Fortynine
/ Referendum Drainage
|
|
|
|
BC
Hydro
>>Vancouver,
British Columbia. 2004.
Site assessment and soil bioengineering prescription development.
- Lower
Stave River
- Aberfeldie
/ Bull River Sites 1 and 2
|
|
|
|
B.C. Hydro Keenleyside
Dam
>> Castlegar,
B.C. Summer/ Fall 2003: Re-establishment of vegetation
on previously constructed berm to provide fish habitat.
Prescription development and implementation of project.
|
|
|
|
Canadian Pacific
Railway
>> Elk
River, Elko, B.C. Fall 2003: Vegetated riprap using live
cuttings and placement of root wads clusters to enhance fish
habitat and provide bank protection. Assisted in construction
and implementation of project.
|
|
|
|
Ministry of Transportation and Highways
|
|
|
Riondel, B.C. Spring 2003: Walkers
Landing Road, steep slope stabilization of slope failure
using soil bioengineering treatment. Prescription
development and implementation of project using “Spyder
hoe” to perform machine- assisted planting. |
|
|
|
Moyie, B.C. Spring 2003: Moyie
18 Mile Pit steep slope stabilization of debris slide
using soil bioengineering treatment. Prescription
development and implementation of project. |
|
|
|
Moyie, B.C. Spring 2002: Moyie Bluff steep slope
stabilization using soil bioengineering treatment. Prescription
development and quality control of project |
|
|
|
Edgewood, B.C. Summer 2001: Root
wads and vegetated crib wall establishment for
bank stabilization and enhancement of fish habitat on
the Inonoaklin River. |
|
|
|
Salmo, B.C. Spring 2001: Slope
stabilization of large slope failure within riparian area
using soil bioengineering techniques, addressing
water drainage and sedimentation input into Sheep Creek. |
|
|
|
Creston, B.C. Spring 2001: Vegetated RipRap, Goat
River, Site maintenance and monitoring. |
|
|
|
Creston, B.C. Summer 2000: Vegetated RipRap, Goat
River. Implementing vegetative treatment within riprap
on bridge approach. |
|
|
|
|
Private Land, Veterinary
Clinic
>> Creston,
B.C. Spring 2003: Stabilization
of eroded slope using biotechnical slope stabilization techniques.
Prescription development and implementation of project.
|
|
|
|
Dawson Construction
Limited
>> Moyie,
B.C. Spring 2003: Moyie Bluff steep slope stabilization
using soil bioengineering treatment. Prescription development
and implementation of project. Trial treatment on two sites
using “Straw wattle” and “compost
application” in conjunction with live cuttings and
seeding.
|
|
|
|
Transportadora de
Gas del Peru
|
|
|
|
|
|
Upper
Amazon, Peru, Spring/,Summer/ Fall 2002: Evaluation and
recommendation of erosion/sediment control and slope stability
control measures for the Camisea gas pipeline system. Training and direction of local personnel as well as the establishment
of two trial sites using soil bioengineering techniques. |
|
|
|
|
Camisea
project - a major development to transport natural
gas in southern Peru |
|
|
|
Klohn Crippen Consultants Ltd. Nelson
office |
|
|
Thrums, B.C. Winter 2003:
Stream Bank Protection Assessment and Bioremediation Prescription.
Brilliant reservoir. Columbia Power Corporation. |
|
|
|
Salmo, B.C. Spring 2002: South Salmo
Slide Review. Columbia Basin Fish & Wildlife Compensation
Program. |
|
|
|
Shore Acres, B.C. Spring 2002: Slope
Protection Assessment and Bioremediation Prescription,
Thiessen Property, Brilliant reservoir. Columbia Power
Corporation |
|
|
|
Castlegar, B.C. Spring 2001: Vegetated
Rip-rap/Bank Stabilization - Drazdoff Property –
Brilliant Reservoir Established 27 pockets of live
cuttings. Planting of native shrub seedlings and seeding.
Columbia Power Corporation |
|
|
|
Kootenay River Dyke Repairs, Nelson, Fall
1999. Revegetation Plan Review. |
|
|
|
|
Kalesnikoff Lumber Co. Ltd. |
|
|
West Kootenay, B.C. Summer
2002: Soil
bioengineering / Riparian habitat restoration,
Bald Face Creek Soil bioengineering / Upper
slope stabilization, Shroeder Creek. |
|
|
|
Nelson, B.C. Fall 2001: Manual deactivation
of old road system to reduce sediment delivery into
domestic water supplies, helicopter access. |
|
|
|
Blewett, B.C. Spring 2000: Soil Bioengineering,
Rover/Connor Creek, Site maintenance (repair and pruning),
and completion of stabilization project. |
|
|
|
Nelson, B.C. Fall 1998: Soil Bioengineering,
Rover & Connor Creek, Site assessment and implementation
of biotechnical slope stabilization treatment. Installation
of a catchment basin to bridge water over unstable headscarp
of Referendum Creek landslide. |
|
|
|
|
Meadow Creek Cedar Ltd. |
|
|
Coffee Creek, B.C.
Fall 2001: Installation of five large sediment traps
at bottom of landslide to reduce sediment delivery into
fish bearing stream. Planting of riparian species. |
|
|
|
Nelson, B.C. Fall 1999: Soil Bioengineering,
Coffee Creek. Site assessment and implementation of
biotechnical slope stabilization trial treatment on large
gully. |
|
|
|
|
Tembec Industries Inc. |
|
|
Cranbrook, B.C. Fall, 2001:
Riparian Restoration and Fish Habitat Restoration.
Live gravel bar staking; establishment of 12,000 live
gravel bar stakes over 9 gravel bars using hand crews
and excavator to assist planting within Bighorn Creek. |
|
|
|
Cranbrook, B.C. Fall, 2001: Soil Bioengineering
Treatment for Landslide Rehabilitation Matthew Creek,
as well as upgrade and maintenance of two sites established
in fall of 2000 near Kimberley, B.C. |
|
|
|
Cranbrook, B.C. Fall 2000: Riparian
Habitat Restoration Bighorn Creek Site 1 and 2,
near Elko, B.C. Site assessment and prescription of eroded
stream bank. Implementation of bioetechnical slope stabilization
treatment and planting of native shrub seedlings and seeding
of a large riparian area. |
|
|
|
Cranbrook, B.C. Fall 2000: Soil Bioengineering
Treatment for Landslide Rehabilitation Matthew Creek.
Implementation of site prescription developed by Polster
Environmental Services. |
|
|
|
|
Nelson Waldorf School
>> Nelson,
B.C. Spring 2001: Cut slope stabilization behind newly
constructed building. Establishment of three rows of
brush layers combined with fascine bundles and mycorrhiza
fungus inoculation. |
|
|
|
Downie Street Sawmills Ltd. |
|
|
Revelstoke, B.C. Spring 2001: Bioremediation,
Akolkolex River FSR, km 21. Site 2. Completion of
section 1, using soil bioengineering techniques, alder
seedlings and grass seeding. |
|
|
|
Revelstoke, B.C. Spring 2000: Bioremediation, Akolkolex
River FSR, km 21. Site 2, Site maintenance and completion
of project implementation using biotechnical slope stabilization
treatment. |
|
|
|
Revelstoke, B.C. Fall 1999: Soil Bioengineering,
Akolkolex River FSR, km 21, Site 2, Site maintenance
(repair and pruning), and completion of project. |
|
|
|
Revelstoke, B.C. June 1999: Soil Bioengineering,
Akolkolex River FSR, km 21. Site 2, Site assessment
and implementation of biotechnical slope stabilization
treatment. |
|
|
|
|
Pope and Talbot Ltd. |
|
|
Nakusp, B.C. Spring 2001: Soil
Bioengineering / Riparian Habitat Restoration Heart Creek
Site 1 and 2, near Fauquier, B.C. Completion of site
started in the Fall of 2000. |
|
|
|
Nakusp, B.C. Fall 2000. Soil Bioengineering
/ Riparian Habitat Restoration Heart Creek Site 1 and
2, near Fauquier, B.C. Site assessment, prescription
and implementation of bioetechnical slope stabilization
treatment and planting of native shrub seedlings and seeding. |
|
|
|
|
Harrop Procter Watershed
Protection Society
>> Procter,
B.C. Spring 2000: Training of youth crew in live staking
installation as erosion control prevention on Mill Creek hiking
trail.
|
|
|
|
M.O.E.L.P. Columbia Forest District, Kootenay
Region |
|
|
Revelstoke, B.C. Spring 2000: Bioremediation/
Riparian Habitat Restoration, Akolkolex River FSR, km
21. Site 3, Site maintenance and repair. |
|
|
|
Golden, B.C. Spring 2000. Bioremediation/ Riparian
Habitat Restoration, Moose Creek, Beaverfoot Valley,
Site prescription and implementation of biotechnical slope
stabilization treatment. |
|
|
|
Revelstoke, B.C. October 1999. Bioremediation/ Riparian
Habitat Restoration, Akolkolex River FSR, km 21. Site
3, Site assessment and implementation of biotechnical
slope stabilization treatment. |
|
|
|
Golden, B.C. Fall 1999. Bioremediation/ Riparian
Habitat Restoration, Moose Creek, Beaverfoot Valley,
Site assessment and harvesting of live material to be
placed in cold storage for spring project. |
|
|
|
Revelstoke, B.C. June 1999. Soil Bioengineering
/ Riparian Habitat Restoration, Akolkolex River FSR, km
21. Site 1, Site assessment and implementation of
biotechnical slope stabilization treatment. |
|
|
|
Nelson, B.C. May, 1999. Hawkins Creek Dike Planting,
Compensatory Habitat Project, Site assessment and
implementation of mounds, planting of native shrubs and
grass seeding. |
|
|
Creston, Community
Forest Corporation
>> Erickson,
B.C. Fall 1999: Soil Bioengineering, Sullivan Creek.
Site maintenance (repair and pruning), and installation of
cross ditches. |
|
|
|
Kootenay Lake Forest District |
|
|
Nelson, B.C. Fall 1999: Soil
Bioengineering, Busk Creek. Site maintenance and
monitoring. |
|
|
|
Nelson, B.C. Fall 1999: Landslide and
Erosion Channel Rehabilitation of Smallwood Creek,
Site assessment and implementation of biotechnical slope
stabilization treatment on three different sites. |
|
|
|
Nelson, B.C. Fall 1998: Bioremediation,
Busk Creek, Landslide rehabilitation using various
types of willow structures and sediment traps (with rocks,
logs, and straw bales), silt fences (Geo. textile), grass
seeding and mapping. |
|
|
|
|
Atco Lumber Ltd
>> Nelson,
B.C. Fall 1998: Give
Out Creek, installation of coconut matting
on side cast materials on downstream side of bridge, using
live stakes to secure matting and grass seeding.
|
|
|
|
Crestbrook Forest Industries Ltd. |
|
|
Yack, B.C. Fall 1998: Soil Bioengineering,
Russell Creek, Site assessment and implementation
of biotechnical slope stabilization treatment including
the use of sediment traps. |
|
|
|
Yack, B.C. Fall 1997: Bioengineering, Russell Creek,
Site assessment and implementation of biotechnical slope
stabilization treatment. |
|
|
|
|
Boundary Forest
District
>> Fall
1998: Soil Bioengineering, Hall Creek, Site assessment
and implementation of biotechnical slope stabilization treatment
for demonstration site.
|
|
|
|
Slocan Forest Products
Ltd.
>> Slocan,
B.C. Summer 1998: Soil
Bioengineering, Springer Creek, Site assessment and
implementation of biotechnical slope stabilization treatment
using dormant willow from cold storage.
|
|
|
|
Nelson Forest Region
>> Nelson,
B.C. Fall 1997. Soil
Bioengineering, Coffee Creek, Formal on site training
on implementation techniques on two different sites (1.1 &
2.2 km) and installation of various structures including willow
gathering.
|
|
|
|
Arrow Forest District
>> Castlegar,
B.C. Summer, 1996: College
Creek, Blueberry Community Watershed, Level II road
deactivation, assessment and prescription. Level III machine
supervision and implementation of major works, stream bank
rehabilitation, grass seeding and control of surface erosion.
|
|
|
|
|
|