CRESTON VETERINARY HOSPITAL Bank Stabilization Project

 

Location: Bank adjacent to parking lot of Creston Veterinary Hospital, Creston, BC

 

Client: Creston Veterinary Hospital

 

Objective: Stabilize bank adjacent to parking lot of veterinary hospital.

 

The Creston Veterinary Hospital and adjacent parking area was constructed on fill material. Erosion of a 48 m long section of bank forming one side of this fill was causing the pavement in the parking area to crack. Terra Erosion Control Limited was retained in the spring of 2003 to provide remediation measures. These measures consisted of installing soil bioengineering structures such as brush layers and broadcast seeding with an erosion control seed mix in order to vegetate the bank. Straw wattles were also installed in order to provide immediate control of surface erosion. Live cuttings used in the brush layers consisted of a mix of Willow (Salix ssp.) and Red-Osier Dogwood (Cornus stolonifera). Planting was machine-assisted, using a backhoe. These treatments have been successful to date at controlling erosion and stabilizing the bank with root mass.

 
 
 
Site before treatment, Spring 2003

Site before treatment, 2003

   
Installation of brush layers, Spring 2003

Installation of brush layers, Spring 2003

Completed erosion control measures

Completed erosion control measures

Completed erosion control measures

Completed erosion control measures

Site summer 2003

Site summer 2003

Site summer 2003

Site summer 2003

 
Site summer 2004

Site summer 2004

Site September 2005
Site September 2005
Site September 2005
Site September 2005

 

Close-up of growth from cuttings, September 2005

Close-up of growth from cuttings, September 2005

 